Energy Efficiency Concept

Click below to view other case studies

Objective:
The reduction of energy consumption and production rationalisation of their tennis ball factory in Manila.

Solution:
Significant cost savings over time (app. € 500.000,-/a), through the implementation of energy efficiency

measures and changes in the production process
Which included:

• Steam and hot water boilers

• Cooling systems

• Air conditioning and ventilation

• Lighting systems

• Production processes and materials